Skip to content
Concept visual of a social media scheduling console with a content calendar and engagement graph on a dark navy background.
AutomationSpecified

Social Automation

Plan, schedule and measure social content from one calendar.

Modules
6
Journey steps
4
Integrations
4
Indicative build
5–9 weeks

How to read this page: Concept specification: this page documents a system TECH360 can build. It is not a delivered client project, a verified case study, a working demonstration or a measured outcome.

B · Problem & target users

What this system is designed to replace

  • Content is planned in one tool, approved in another and published manually.
  • Asset versions and captions drift apart before publishing.
  • Performance is reviewed in screenshots rather than first-party data.

Target users

  • Content planners
  • Designers
  • Approvers
  • Analysts

C · Objectives & intended benefits

Design intent, not measured outcomes

  • Plan content on one calendar with owners and states.
  • Require approval of caption and asset as one unit.
  • Publish through the platform API and record the result.

These are goals the build is designed to serve. No efficiency, revenue or conversion result is claimed.

D · Product overview

What the system is, and where it runs

A social operations console: content calendar, per-platform scheduling, asset library, approval step, and engagement capture where the platform API allows it.

Planner calendar

Month and week views with channel slots.

Review queue

Caption and asset versioned together.

Reporting view

Scheduled versus published versus failed.

Platforms listed describe the intended build. A specific engagement may narrow or extend them after scope approval.

E · Module inventory

Modules in the specification

  • Content calendar and queue
  • Per-platform post variants
  • Approval before publish
  • Asset library
  • Engagement capture
  • Reporting by channel

Capabilities the system is designed to provide

  • Schedule content per platform with an approval step
  • Keep one asset library with usage history
  • Record engagement data where the platform API exposes it
  • Report on cadence and channel mix from first-party records

F · Screen gallery

No verified product screenshots for this concept

This project has not been built, so there are no application screenshots to show. The image on this page is a generated concept visual, not a capture of working software. Presenting it as a product screenshot would misrepresent the system, so this section says so explicitly.

Concept visual of a social media scheduling console with a content calendar and engagement graph on a dark navy background.
Generated concept visual — not a screenshot of a working application.

G · User journey

The intended path through the system

  1. Step 1

    Plan

    A slot is created with owner, channel and objective.

  2. Step 2

    Create

    Caption and asset versions are attached to the slot.

  3. Step 3

    Approve

    An approver signs off the exact version pair.

  4. Step 4

    Publish

    The approved pair is published and the provider reference stored.

H · Roles & permissions

Who can do what

Roles and their access boundary
RoleAccess boundary
PlannerCalendar and slots.
DesignerAssets for assigned slots.
ApproverApprove or reject exact versions.
AnalystRead-only performance data.

I · Architecture & API

Service boundary and HTTP surface

API endpoints
EndpointPurpose
POST /api/slotsCreate or move a scheduled slot.
POST /api/approvalsApprove an exact captioned asset version.
POST /api/publishPublish only an approved version pair.

Endpoints are the intended contract. Authorisation is enforced server-side per role, never only in the interface.

J · Data entities

Core entities and relationships

Data entities
EntityRelationship
SlotBelongs to a calendar and channel.
AssetVersionBelongs to one slot.
ApprovalBinds one asset version and one caption version.
PublicationBelongs to one slot; records provider id and state.

K · External integrations

Provider-dependent integration points

  • Meta Graph API
  • LinkedIn API
  • X API
  • Webhook feed source
  • Social platform APIs
  • Object storage
  • Notification channels
  • Analytics warehouse

Each integration is configured and accepted against the specific provider account before go-live.

L · AI & automation

Opportunities and their human gate

Draft caption variants for a planned asset.

Human gate: Approver selects and approves one variant.

Flag copy that may breach a platform policy.

Human gate: Advisory only; approver decides.

M · Security, privacy & accessibility

Controls the build is specified to enforce

  • Platform tokens are stored encrypted and never exposed to the client.
  • Publishing requires an approved version binding.
  • Per-channel permissions limit who can publish.

Accessibility is treated as an acceptance criterion for keyboard, focus and contrast on every screen. No certification or audit result is implied.

N · Testing & quality assurance

What would have to be proven before handover

  • Approval-binding tests (caption change invalidates approval).
  • Provider failure and retry tests.
  • Token rotation drill.

O · Deployment & hosting

Where and how it would run

  • Scheduled worker plus web app
  • Encrypted secret store
  • Retry queue with dead-letter handling

P · Maintenance & scalability

Keeping it maintainable

  • Channel adapters versioned separately
  • Asset retention policy
  • Rate-limit aware publishing

Q · Optional advanced features

Out of the initial scope, available later

  • Multi-brand calendars
  • Comment moderation queue
  • Creative performance comparison

R · Related

Related solutions and next step

What this page does not claim: Each platform requires its own app review and token lifecycle. No reach or engagement growth is claimed.

Claims policy: this page is checked against a forbidden-claim list (6 patterns, including invented percentage results, “case study” and guarantee language) by the repository test suite.